New England NSW Manufacturer Apollo Engineering Optimises Supply Chain Operations and Data Processing Capabilities
Deploys IT&T Infrastructure from Leading Edge Data Centres and Tamworth based MSP Toim Technology.
"Thanks to Leading Edge Data Centres and Toim Technology we’ve been able to save over 90 hours of lost staff productivity a month which roughly equates to over $15,000 in savings for Apollo Engineering”.
Ben Bronkhorst Business Development Manager at Apollo Engineering
By downloading this case study you’ll learn:
The challenges Apollo Engineering experienced by using an outdated network.
About how Leading Edge Data Centres and Toim Technology deployed an updated locally routed network with NBN POI connectivity for Apollo Engineering.
How Apollo Engineering saved over $15,000 in staff productivity savings per month along with improved employee job satisfaction and retention.
Download the Case Study
Our Partners
Utilising Leading Edge Data Centres interconnected network of DC’s to deploy services for regional businesses across Australia.